CASE STUDY · MANHATTAN

Behind schedule to finished in three weeks

A 12-story residential tower in Manhattan came to us already late.

The situation

The MEP coordination and drawings were behind. The general contractor needed a team that could pick the work up and close it out.

What we did

  • Took the BIM lead and carried the load
  • Full-building MEP model: plumbing, HVAC and mechanical piping, ductwork, fire protection
  • Coordination across trades, conflicts solved in the model
  • Install-ready plans and sections

The result

Finished in three weeks. The GC received a coordinated set without carrying the coordination work. That is how we normally work: ahead of submissions.

Send us your drawings. Upload a few sheets below, or email Team@pipedreamsolution.com.

Start a project

Send us your drawings.
We will show you the risks first.

Upload a few sheets or paste a link to the full set (Box, Dropbox, Google Drive, BuildingConnected, Procore). It goes straight to our team.

Rather email? Team@pipedreamsolution.com

Trades