MEP Coordination and Clash Detection
We combine every trade’s model in Navisworks, find the clashes and run the coordination until each trade signs off.
We lead the meetings
- Weekly clash runs
- Minutes that name an owner for every open item
- Open items tracked to zero
- Written trade sign-off before release
For the GC, or for one trade
We can lead MEP coordination for the general contractor, or model and coordinate one trade for a subcontractor. Many GCs hand us the whole effort so their team stays on the job, and the submissions stay ahead of the field.
Fixes a crew can install
Our team has worked in the field, so a proposed fix accounts for hangers, insulation, access and service clearance, not only two boxes touching.
Deliverables
Navisworks files (NWC/NWD), clash reports, meeting minutes and updated Revit models after each round. We work in Autodesk Construction Cloud and Procore.
Questions
What is clash detection in construction?
Software checks where pipes, ducts, sprinklers, conduit and structure hit each other, so the fix happens on screen, not in the field.
What software is used for MEP clash detection?
Navisworks, with a Revit model from each trade.
Who runs the BIM coordination meetings?
We do: we prepare the views, lead the meeting, issue minutes and track open items.
When is MEP coordination finished?
When open items are at zero and every trade has signed off on its space.
Send us your drawings. Upload a few sheets below, or email Team@pipedreamsolution.com.
Send us your drawings.
We will show you the risks first.
Upload a few sheets or paste a link to the full set (Box, Dropbox, Google Drive, BuildingConnected, Procore). It goes straight to our team.
Rather email? Team@pipedreamsolution.com