Multi-Trade BIM Coordination for MEP
We combine every trade’s model in Navisworks, find the clashes and run the coordination until each trade signs off. We can lead it for the general contractor or coordinate one trade for a subcontractor.
Request a Proposal
What the service includes
- Combining plumbing, HVAC, fire protection and electrical models, plus structure and architecture, in one coordinated view
- Weekly clash runs and prepared views for each coordination meeting
- We lead the meetings and issue minutes that name an owner for every open item
- Open items tracked to zero, with written trade sign-off before release
- Composite drawings once the model is clash-free
Who benefits
- General contractors that want to keep their team on the job and hand off the coordination effort
- MEP subcontractors that need their own scope coordinated with the other trades
- Construction managers who need one point of contact for every MEP trade
Typical deliverables
- Navisworks files (NWC/NWD)
- Clash reports
- Meeting minutes with owners and status for every open item
- Updated Revit models after each round
- Composite drawings and trade sign-off record
Our technical capabilities
- Navisworks clash detection with a Revit model from each trade
- We can coordinate your own subcontractors, so your PM has one person to call about every MEP trade
- Proposed fixes that account for hangers, insulation, access and service clearance, not only two boxes touching
- Work in Autodesk Construction Cloud and Procore
How it reduces field conflicts, delays and rework
Coordination moves the argument about who gets which space from the field to the model. Each trade sees the conflicts affecting its scope while it can still re-route on the screen, every decision is written in the minutes, and the drawings are released only after the trades have signed off on their space.
Project example
Project example: a 12-story residential tower in Manhattan came to us with its MEP coordination and drawings already behind. We took the BIM lead, built the full-building MEP model, resolved the conflicts in the model and issued install-ready plans and sections. The general contractor received a coordinated set in three weeks without carrying the coordination work. Read the case study.
Questions
What is MEP BIM coordination?
Combining the models of every MEP trade with structure and architecture, finding the conflicts, and resolving them in the model before installation. See our detailed answer.
What software is used for MEP clash detection?
Navisworks, with a Revit model from each trade.
Who runs the BIM coordination meetings?
We do: we prepare the views, lead the meeting, issue minutes and track open items.
When is MEP coordination finished?
When open items are at zero and every trade has signed off on its space.
Send us your drawings. Upload a few sheets below, or email Team@pipedreamsolution.com.
Download sample drawings
Selected sheets from past projects: coordinated plans, sections, spool and isometric sheets and 3D views across mechanical, plumbing, fire protection and electrical. Project and client details are left out. Enter your email to unlock the PDF.
Thank you. Your download is ready.
Download sample drawings (PDF)Published by Pipe Dream Solutions LLC, a veteran-owned BIM and VDC company in New York City serving contractors nationwide. Last updated November 21, 2026.
Send us your drawings.
We will show you the risks first.
Upload a few sheets or paste a link to the full set (Box, Dropbox, Google Drive, BuildingConnected, Procore). It goes straight to our team.
Rather email? Team@pipedreamsolution.com